McKervey SolutionsCEMENT PLANT TRAINING & CONSULTING
CCR Academy by McKervey Solutions

Your next kiln upset should happen on a simulator.

We train cement control room operators on real kiln problems, like ID fan surges, cold kilns, cyclone jams and power dips, on a simulator tuned to your plant. A mistake here costs nothing. On your kiln it costs a day of clinker.

Runs in a web browser. No DCS connection. No IT project.

CCR ACADEMY · KILN LINE 1 · DRILL U-0206:00:00
OK NO ACTIVE ALARMS
Burning zone
2,650°F
Kiln exit O₂
2.1%
Kiln exit CO
90ppm
Hood draft
-0.10inWC
ID fan speed
84%
Clinker rate
110stph
▬ O₂ %   ▬ CO ppmLAST 60 S
COACHHandover: kiln steady at full feed. Fan has been running rough. Keep an eye on draft.
5cement plants managed by our founder
40+years in cement, quarry to kiln to boardroom
22real-world drills, from coating collapse to kiln startup
2languages, English and Spanish, in plain words
The problem every plant manager has

Your kiln is only as good as the operator on shift.

Plant managers hear from vendors every week who promise their product pays for itself. Most of those claims don't hold up. What does get attention is a real problem solved. And nearly every plant has the same one: control room operator competency.

Veterans are retiring

The operators who can feel a ring forming or a coating about to drop are leaving, and their know-how leaves with them.

Every shift runs it differently

Buddy training passes on habits, good and bad. Four crews end up running one kiln four ways, and the lab sees it in free lime.

Upsets are rare, then expensive

An operator may see a real ID fan surge or power dip once a year. That is a bad time to learn. One wrong move can trip the kiln.

What lost production costs

One avoided lost day pays for years of training.

For a sold-out plant, every ton of clinker you don't make is margin you don't get back. The math is simple.

Clinker value when used to make cement~$100/ton
Variable cost of clinker~$30/ton
Margin lost per ton not made$70/ton
One hour down at 100 tons/hour$7,000
One day of lost production$168,000

Before restart fuel, refractory and shell stress, and off-spec clinker, which cost you whether you are sold out or not.

Run your own numbers

100 t/h
$70/ton
24 h/yr
Per hour down$7,000
Per day down$168,000
Value of 24 hours saved a year$168,000

Estimates only. A market-limited plant can often make up lost clinker later, so its loss per hour is lower; restart costs still apply.

The solution

CCR Academy: a flight simulator for your kiln.

Operators sit a real shift on a live control screen. A problem hits. They read the trends, call what's wrong, and make their moves. Then a coach walks them through what went well and what to work on.

  • 22 drills across the kiln, preheater, cooler, mills and utilities
  • Tuned to your plant's equipment, fuels and raw mix by an experienced engineering team, using advanced AI
  • Plain-language coaching, by text or voice, in English or Spanish
  • Scored on safety, steady running and response, with crew readiness reports for managers
FOR

Control room operators

Practice the upsets they rarely see, until the right move is a habit.

FOR

Trainees moving up

Field operators learn the board before they ever take the chair.

FOR

Engineers & supervisors

Everyone who touches the kiln learns how a move in one place shows up in another.

FOR

Plant managers

See who is ready, who is close, and who needs work, across every crew.

How it works

From first call to a trained crew in 90 days.

Tailor

We set the simulator to your kiln line: preheater stages, calciner, cooler, fuels and alternative fuels, and the way your screens look.

Train

Operators run drills on their own or with a trainer. Hints and coaching are there when they need them, and cost points when they use them.

Test

Test mode takes the help away and changes the problem each time, so a good score means the operator knows it, not just remembers it.

Measure

You get a readiness view for every operator and printable training records to support your program.

Built by a cement man

This wasn't built by a software company guessing at cement. It was built by someone who has run the kiln, the quarry and the whole plant.

Gerry McKervey has managed five cement plants for Essroc, Lehigh, Capitol Aggregates and Giant Cement. He has set clinker production records, commissioned coolers, scrubbers and SNCR systems, and trained the people who run them. CCR Academy puts that experience in front of every operator, on every shift.

Gerry McKervey · Owner, McKervey Solutions · B.S. Mining Engineering, University of Missouri-Rolla

See your kiln on the simulator.

Book a 30-minute demo. We'll run a live drill, show you the crew readiness view, and talk through a 90-day pilot at your plant.